AV Project

Project Information

Role: 

  • Brought on board at stage 3 to complete BIM modelling of all AV/IT equipment in REVIT 2019.

  • To undertake responsilbility of full COBie compliance​​

 

Status: 

  • Design information completed early 2023, currently under construction

 

Timeline: 

  • Total project approx 3 years

 

Team:

Internal team: Ross, Vaughn

External team: 

  • Client (AC/IT Consultant): Blend

  • End client: N/A (Confidential)

  • Lighting Designer: Nulty

  • MEP Consultant: Troup Bywaters and Anders

Media Control Suite Plan.JPG
Overview

The AV/IT project spanned diverse spaces within a 15-floor building, encompassing an auditorium, control rooms, offices, multi-function rooms, lift lobbies, a security control room, reception areas, meeting rooms, rack rooms, and seminar rooms. Design coordination, clash detection meetings, and internal discussions with the client played pivotal roles in navigating the project's complexity. With fortnightly model releases, the team adeptly addressed challenges associated with various room types and unique spaces, fostering transparent communication through Teams chats, live model sharing, and leveraging elevation and section views, as well as 3D and isometric views.

Not DB GOP Data Outlet with alternate properties.JPG
Not DB Security Part Plan.JPG
Media Control Suite.JPG
Challenges and Successes

Overcoming challenges in the AV/IT project required innovative solutions in each area. In the auditorium, a robust framework was devised for the expansive LED display curved screen wall, accompanied by the development of a bespoke family capable of tessellating in three axes, ensuring a seamless integration. The control room, featuring unique equipment, saw the creation of a specialized family designed for both screens and desk clamps, addressing the distinct requirements of the space. Meeting rooms, varying in size, presented a challenge met through tailored arrangements, emphasizing adaptability to different spatial configurations. The consideration of the project's overall scale played a crucial role in navigating and overcoming these challenges, highlighting the importance of a comprehensive and flexible approach to ensure success.

Screenshot 2024-02-15 at 3.33.06 pm.png
Screenshot 2024-02-15 at 3.36.14 pm.png

The success of the AV/IT project is underscored by meticulous attention to detail in modeling families, surpassing the standard level of precision necessary for the task at hand, ensuring accurate representation and functionality. Additionally, the project's triumph is evident in the production of a clear and comprehensive set of information. This detailed documentation serves as a valuable resource, providing clarity and guidance for seamless project execution, reflecting the project's overall success in meeting and exceeding the specified requirements.

Final Outcome and Testimonial